Decorating Finishing Mechanical Primary Bathroom Bonnie Fiorito May 12, 2022 0 Comments Since the shower was under construction, we decided to add some more shiplap. This time to the wall behind the tub.Shower tile install by tempelmanm@gmail.com The sauna, that is accessed through the shower, was also completed. The light grey penny round shower and sauna floor tile was purchased from http://www.anttilatile.ca/ .Wall and main floor from https://www.lowes.ca/product/tile/american-olean-12-in-x-24-in-bellizzi-neve-white-glazed-porcelain-floor-tile-458979 A cold water faucet was added for making some steam! First firing! Previous Post Next Post Related Posts Insulation July 5, 2018 Master bath projects March 15, 2020 Wood Ceiling-Two Boards Short August 17, 2018 No Comments Leave a Reply Cancel ReplyName * Email * Website Δ
No Comments