Decorating Finishing Mechanical Primary Bathroom Bonnie Fiorito May 12, 2022 0 Comments Since the shower was under construction, we decided to add some more shiplap. This time to the wall behind the tub.Shower tile install by tempelmanm@gmail.com The sauna, that is accessed through the shower, was also completed. The light grey penny round shower and sauna floor tile was purchased from http://www.anttilatile.ca/ .Wall and main floor from https://www.lowes.ca/product/tile/american-olean-12-in-x-24-in-bellizzi-neve-white-glazed-porcelain-floor-tile-458979 A cold water faucet was added for making some steam! First firing! Previous Post Next Post Related Posts Painting August 10, 2018 Vaulted Ceiling All Done! September 9, 2018 Stone August 10, 2018 No Comments Leave a Reply Cancel ReplyName * Email * Website Δ
No Comments